When I got home yesterday, the microwave was hung along with the first few shelves. Today there are a few more shelves. The bottom shelf along the brick wall is not finished yet. It is looking pretty much as I envisioned it. Tomorrow the fridge shows up!
My life in so-called photogs.
Check out my portfolio and get prints: http://www.lennym.com
BTC: 19FhYqEkbJeHfTiYKcPFCNUqSMk5zC6x6H
Tuesday, August 21, 2012
Evergreen Mountain and Three Sisters
Sunday Ryan and I went out for a ride. We hit up Evergreen Mountain and Three Sisters in Evergreen for a good morning ride:
Labels:
colorado,
evergreen,
mountain biking,
three sisters
Thursday, August 09, 2012
Granite Installation
The granite countertops are installed and beautiful. I just hope they are not too busy. The house smells like glue and sealant.
Tiny Cabin
When Lexey and I were in Plattsburgh for a weekend in July we stayed in a "Tiny Cabin" we found on Airbnb.
The place was great. It really is tiny, but suitable. The bed is reached via ladder. The toilet is an RV toilet. The shower has instant hot water. There are dishes and such to cook with. The lake is just past the main house with a great dock!
We invited Shaun and Stacy over one evening for cheese and crackers with some beer on the dock. Great time.
The place was great. It really is tiny, but suitable. The bed is reached via ladder. The toilet is an RV toilet. The shower has instant hot water. There are dishes and such to cook with. The lake is just past the main house with a great dock!
We invited Shaun and Stacy over one evening for cheese and crackers with some beer on the dock. Great time.
Labels:
airbnb,
lake champlain,
new york,
plattsburgh,
travel
Wednesday, August 08, 2012
Kitchen Remodel - base cabinets
The past few days have been focusing on getting ready for the countertops. The base cabinets are framed out and anchored to the walls. The granite template has been done and the countertops will be installed tomorrow!
Looking through the house from the front:
The kitchen from the dining room:
From the back:
Looking through the house from the front:
The kitchen from the dining room:
From the back:
Monday, August 06, 2012
Kitchen Remodel - floor done
Lexey and I were away in Vail for the weekend. When we came back Ryan had finished the floor and painted the walls. It is all set now for putting in some cabinets!
Mostly porcelain with granite highlights:
Mostly porcelain with granite highlights:
Sunday, August 05, 2012
Mountain biking in Vail with Lexey and Melanie
Since having the baby, Melanie has been really busy. Lexey and I got her out for an easy 12 miler on some dirt up Red Sandstone Road. Great scenery back there.
Lexey and Melanie up at Red Sandstone Road overlooking Vail Mountain:
The ride:
Lexey and Melanie up at Red Sandstone Road overlooking Vail Mountain:
The ride:
Kitchen: Primed and Ready
The walls got all patched and the primer was applied. Things are looking good.
From the back:
From the living room:
From the back:
From the living room:
Saturday, August 04, 2012
Kitchen Remodel continues
Ryan continued by moving plumbing, moving electrical, and laying backer board for the upcoming tile installation.
Partially laid backer board:
Plumbing for the sink moved to the wall:
Patches in place:
Patched up where there was a concrete post to shim the doorway:
All primed:
Partially laid backer board:
Plumbing for the sink moved to the wall:
Patches in place:
Patched up where there was a concrete post to shim the doorway:
All primed:
Subscribe to:
Posts (Atom)